Skip to main content

Commercial Solar ROI in Pakistan Under Net Billing

For a factory or commercial building in Pakistan, solar return now depends on one number more than any other: the share of your solar output that you use on site. Since NEPRA moved new connections from net metering to net billing in 2026, a self-consumed unit saves the full commercial or industrial tariff — roughly Rs 50 to 60 — while an exported unit earns about Rs 11.

That makes most factories very strong solar candidates, because machines run in daylight when panels produce. It also means a system sized for the roof rather than the load can lose a large part of its value without anyone noticing. This guide shows how to estimate commercial solar ROI under the current rules, what our industrial projects have taught us, and which design choices protect the return.

If you run a textile mill specifically, our textile mill guide covers sizing by mill type. This page is about the economics that apply to any factory, warehouse, office or plant.

Why Self-Consumption Decides Commercial ROI

Under the old net metering rules, a unit exported at noon cancelled a unit imported at night, one-for-one. A factory could size for its roof, export on Sundays and holidays, and still be credited at full value. That is no longer true for new applicants. Under NEPRA’s Prosumer Regulations 2026, exports are bought at roughly Rs 11 per unit and imports are billed at your normal tariff. Sites approved before the change keep their old terms until their agreement expires; our NEPRA prosumer regulations guide explains the details.

The Supreme Court of Pakistan system we installed shows the old model at its best: approved under pre-2026 net metering, it exports enough surplus that the grid now owes the Court on balance. A new system of the same size would not earn that way. Today the value comes from using the power, not selling it.

The Numbers: A 100 kW System at Different Self-Consumption Levels

A well-oriented 100 kW rooftop system in Pakistan produces in the region of 13,000 units a month, varying by city and season. The table below shows what that output is worth at an industrial tariff of about Rs 55 per unit, depending on how much of it the site uses itself.

Self-consumptionUnits used on siteUnits exportedMonthly value (PKR)
95% (day-shift plant with steady weekend load, sized to base load)12,350650~6.9 Lakh
80% (oversized, or closed one day a week)10,4002,600~6.0 Lakh
60% (sized for the roof, light weekend load)7,8005,200~4.9 Lakh
For comparison: old 1:1 net metering——~7.2 Lakh
Illustrative estimate at Rs 55 per self-consumed unit and Rs 11 per exported unit. Your tariff category, fuel adjustments and demand charges will move the absolute figures, but not the gap between rows.

The same panels on the same roof can be worth about Rs 2 Lakh a month more or less depending on design. Over a 25-year asset life, that difference is larger than most of the equipment choices factory owners spend their time on.

The system cost side of the ROI is quoted per site, because structure, cable runs and interconnection vary widely at commercial scale. Price per kW at this scale also depends on whether the system is on-grid or hybrid. Our commercial solar team will give you a firm figure after a site survey.

Matching Solar to Your Daytime Load

Getting into the top row of that table is an engineering exercise, and it starts with your load curve rather than your roof area.

  • Size to the daytime base load. Look at what the plant draws between roughly 9am and 4pm on a normal working day, not the monthly units on the bill. The array should be sized so that midday output rarely exceeds that draw.
  • Account for weekly closures. A plant shut on Sundays exports a full day’s generation every week. Even if every weekday unit is used, that alone pulls self-consumption from close to 100% down to the mid-80s. Light Sunday loads such as cold rooms, compressors or water pumping help.
  • Move flexible loads into the sun. Batch processes, pumping, compressed-air top-up and charging forklifts can often be scheduled for late morning and early afternoon at no cost.
  • Use storage only where the evening load justifies it. For a second shift, a battery can shift midday surplus into the evening. At commercial scale this needs its own payback calculation; for a single day shift it rarely pays.
  • Integrate the generator, if you run one. Many sites still rely on diesel during load-shedding. A PV-genset controller lets solar and the generator share load instead of the solar shutting down whenever the grid does.

What Our Industrial Projects Show

The projects below are live case studies, and each one illustrates a different part of the ROI.

  • Al-Sheikh. The site was capped by its generator and its pole-mounted transformer. On-grid solar plus a PV-genset synchronisation controller let solar carry daytime load and run in parallel with the generator, so the plant could bring more machines online by day while cutting diesel and grid costs.
  • Diamond Group, Port Qasim (250 kW). A coastal roof that could not be drilled. We fixed a hot-dip galvanised structure to the existing pillars so the array resists salt air for the life of the panels — protecting the 25-year return, not just the first year’s.
  • Springs factory. A tripped breaker was flagged by Sol AI within hours. An earlier, similar fault before this monitoring had gone unnoticed for weeks, with the factory paying the grid for power the panels should have supplied.
  • Jubilee Spinning Mills (1 MW). More than 1,700 panels on a mill that operates continuously, with a multi-inverter design so one inverter can be serviced without taking the plant’s solar offline.
  • Philip Morris, Gujranwala. For a regional office, the return was continuity: the building now works through load-shedding that used to stop it.

What Quietly Erodes Commercial Solar Returns

Most underperforming commercial systems were not badly priced. They were designed or run in a way that let value leak out.

  • Silent downtime. A string or inverter that drops out does not stop the machines; it just raises the bill. Sol AI monitors at inverter and string level and sends daily reports and alerts, so a fault is a same-day fix rather than a surprise on next month’s bill.
  • Power-factor penalties. Adding inverters to a plant with heavy motors can change its power factor and trigger utility penalties if the interconnection is not engineered for it.
  • Structure that fails before the panels. Corrosion in coastal Karachi and older warehouse roofs that cannot take penetrations both need site-specific mounting.
  • Oversizing for export. Under net billing, the last 20 kW of an oversized array is mostly selling power at Rs 11.

What a Commercial Proposal Should Include

Before comparing prices, check that each proposal includes:

  • A load analysis using at least twelve months of bills and, ideally, interval data — with a stated self-consumption estimate, not just annual generation.
  • A structural assessment of the roof and a mounting design suited to it.
  • Named Tier-1 panels and inverters. We install mainly Trina, LONGi and Jinko panels with Huawei, Sungrow and GoodWe inverters, and are an officially authorised Huawei and LONGi installer.
  • Installation by an AEDB-certified installer, with the DISCO net billing application handled for you. Systems above 1 MW also need a NEPRA generation licence.
  • Monitoring and maintenance terms that continue after commissioning.

Frequently Asked Questions

What is the ROI of commercial solar in Pakistan in 2026?

It depends mainly on self-consumption. A 100 kW system producing about 13,000 units a month is worth roughly Rs 6.9 Lakh a month at 95% self-consumption and an industrial tariff near Rs 55, falling to about Rs 4.9 Lakh at 60%. Payback follows from your quoted price, so ask for a self-consumption estimate in every proposal.

Does net billing make commercial solar a bad investment?

No. Factories that run in daylight use almost all their solar on site, and each of those units still saves the full tariff. Net billing mainly penalises oversizing and long weekend closures.

Should a factory add batteries?

Only if there is meaningful evening or second-shift load to absorb midday surplus, or if outage costs justify backup. For a single day shift sized to its base load, there is usually little surplus to store.

Can solar work alongside our diesel generator?

Yes. A PV-genset controller lets the array and generator run in parallel, so solar keeps working during outages and the generator burns less fuel. Our Al-Sheikh project is an example.

How large a system can a factory connect to the grid?

Systems up to 1 MW go through the DISCO’s standard application; above that, a NEPRA generation licence is required. The practical limit is usually your daytime load and roof area, not the regulatory ceiling.

Send us twelve months of bills through the commercial enquiry form and we will model your self-consumption before quoting a system size.

Estimate your system size first →